Fitting a new wooden deck, maintenance work & dry docking
HK-86
Manufacturing tailor-made fishing gears
TX-27 ‘Nova Cura’
Fitting aftertreatment system/catalysator to improve reduction of emissions
Cathy Jo’ vrachtschip
Overhaul of anchor winches
‘Loireborg’ vrachtschip
Royal Sander Niestern for Royal Wagenborg Project: overhaul of anchor winches
‘Hekla’ cargovessel
Overhaul of anchor winches
BM-30 ‘Sara Lena’
New derricks including new goosenecks & quick release system
TX-65 ‘Bona Fide’
Fitting aftertreatment system/catalysator to improve reduction of emissions
PZ-101 ‘Louisa N’
New funnel, vessel maintenance & dry docking
WR-123 ‘Anna Johanna’
Re-engining to improve reduction of emissions
WR-40 ‘Anna Carola’
Fitting aftertreatment system/catalysator to improve reduction of emissions
HD-66 ‘Pieter’
Re-engining
WR-22 ‘Jacqueline’
Fitting aftertreatment system/catalysator to improve reduction of emissions.
Ocean rowing boat
hull construction of innovative ocean rowing boat in aluminium
Santa Maria
Conversion of a fishing boat (ex WR126 'Jadi') to a charter sailing yacht
GRE-3
Winch repair
WR-106 ‘Celeste Carlijn’
Delivery & fitting aftertreatment system/catalysator to improve reduction of emissions.
PZ-115 ‘Steph of Ladram’
Delivery of a new 6-drum LUYT winch, new nozzle & prop, new gearbox, new hydraulic pump/motor, new Mitsubishi main engine
HA-42 ‘Antje’
Delivery & fitting aftertreatment system/catalysator to improve reduction of emissions.
E-33 ‘William of Ladram’
Refit, main engine overhaul & dry docking for cleaning, preserving & paintwork
PH-440 ‘Admiral Blake’
Major refit, drydocking, cleaning & paintwork, gearbox overhaul, disconnecting & removal of the main engine & connecting after overhaul
BF-71 ‘Alicja Rose’
Delivery & installing new split winches in stainless steel
‘No Destination’ – yacht
Drydocking & repairworks underwater hull
BM-110
Levering en plaatsing nieuwe LUYT vislier
WY-43
Repainting & refit
MS Orion
Replacement and installation of 18 new portholes
WR-230
Complete winch overhaul & installation
WR-80
Docking, cleaning, preserving & paintwork, increasing the rail to 1m with stainless steel pipe re. Dutch rules, new rudder bearing, new sea cocks, ultrasonics and inspection SI.
WR-7
Drydocking for cleaning & preserving, overhaul steering machine, new frame under sb generator, replacing bearings of conveyor
BM-478
In drydock for new keel cooling, hull inspection, cleaning, preserving & paintwork
TS-10
Full winch overhaul, including installation.
WR-20
Fitting of a new CC Jensen gas oil filter
WR-22
New goosenecks & rail in stainless steel, renew the bilge system & deckwash system
UK-158
Overhaul main engine and gearbox
DIT-3
Maintenance gears, derricks, goosenecks & delivery of new radar
ISLA-B
Drydocking & maintenance
PZ-115
Repair hydraulics, delivery & fitting of new generator set, drydocking
Barge
Repairs and winch maintenance on 13 barges (77.5m)
B74
Reflagging – Place under the English flag
WD-135
Major refit
PZ-19
Reflagging NG19 > PZ19 – Place under the English flag
WR-123
Full winch revision (six drums)
Overname pneumatiek- en besturingssystemen Integron Marine.
Machinefabriek LUYT BV Expands Services with Acquisition of Pneumatics and Control Systems from Integron Marine Controls