current projects
PH-440 ‘Admiral Blake’
Major refit, drydocking, cleaning & paintwork, gearbox overhaul, disconnecting & removal of the main engine & connecting after overhaul
Winch design & winch building for two newly built Interfish beamers
Development & delivery of 2 pneumatic LUYT trawl winches, 2 stainless steel anchor winches, 2 stainless steel landing winches, complete gantry & rigging plan
WR-80
Docking, cleaning, preserving & paintwork, increasing the rail to 1m with stainless steel pipe re. Dutch rules, new rudder bearing, new sea cocks, ultrasonics and inspection SI.
WR-7
Drydocking for cleaning & preserving, overhaul steering machine, new frame under sb generator, replacing bearings of conveyor
BM-478
In drydock for new keel cooling, hull inspection, cleaning, preserving & paintwork